Please allow Active X Scripts to run on this page to see the gallery!

Canal Boat

Dry dock.

Side of the boat.

Dry Dock.

Roof peeling

Dry Dock

Cabin doors.

Dry Dock

Side of the boat rusting and peeling.

Premier At Work

Cabin doors undercoated.

Premier At Work

Cabin doors double undercoated.

Premier At Work

The whole boat red oxided, filled, rubbed down and double undercoated.

Premier At Work

The whole boat red oxided, filled, rubbed down and double undercoated different angle.

Premier At Work

Roof double glossed.

Premier At Work

Bow double glossed.

Premier At Work

Bow double glossed different angle.

Premier At Work

Stern double glossed.

Premier At Work

Side of the boat with the windows sprayed gold.

Finished Project

Bow finished.

Finished Project

Another happy customer :)

Attic

Preparation

Striped wallpaper off.

Preparation

Striped and rubbed down.

Preparation

Starting to fill holes and cracks.

Preparation

Starting to fill holes and cracks.

Preparation

Walls filled and prepared.

Preparation

Started lining the walls.

Preparation

Striped, rubbed down and starting to fill holes and cracks.

Preparation

Striped, rubbed down and starting to fill holes and cracks.

Preparation

Rubbed down the filler holes and started lining the walls.

Preparation

Started lining the walls.

Preparation

Started lining the walls.

Preparation

Started lining the ceiling.

Preparation

Started lining the ceiling.

Preparation

Started lining the ceiling.

Finished Walls

Finished lining the walls.

Finished Walls

Finished lining the walls.

Finished Walls

Finished painting walls.

Finished Woodwork

Finished painting wood work.

Finished Woodwork

Finished painting wood work.

Finished

Finished painting walls, ceiling and wood work.

Kitchen

Preparation

Tapping up fittings.

Preparation

Tapping up fittings.

Preparation

Washing doors down.

Preparation

Racking out cracks.

Preparation

Racking out cracks.

Preparation

Racking out cracks.

Preparation

Racking out cracks.

Preparation

Tapping up cracks.

Preparation

Tapping up cracks.

Preparation

Tapping up cracks.

Preparation

Filling over the tape.

Preparation

Half way through painting a door.

Preparation

1st coats of paint.

Preparation

Walls and ceilings with finished coats.

Walls and front door finished coats.

Finished lining the walls

Walls and front door finished coats.

Finished lining the walls

Entrance hall finished.

Finished painting walls

Washroom finished.

Finished painting wood work

Kitchen finished.

Finished painting wood work

Finished

Kitchen finished.

Wine Cellar

Preparation

Tapping up fittings

Preparation

1st coat cutting in.

Preparation

1st coat cutting in.

Preparation

1st coat cutting in.

Preparation

1st coat cutting in.

Preparation

1st coat on walls.

Preparation

1st coat on walls.

Preparation

1st coat on walls.

Preparation

Finished coats on all the walls.

Preparation

Finished coats on all the walls.

Preparation

Finished coats on all the walls.

Preparation

Finished coats on all the walls.

Living Room

Preparation

Cracking Walls.

Preparation

Cracking walls.

Preparation

Room totally sheeted up.

Preparation

Room totally sheeted up.

Preparation

Filled cracks.

Preparation

Filled cracks.

Preparation

Starting to paint 1st coat.

Preparation

Starting to paint 1st coat.

Preparation

Starting to paint 1st coat, still sheeting up the furniture.

Finished

Finished coats, Farrell and Ball.

Finished

Finished coats, Farrell and Ball.

Finished

Finished coats, Farrell and Ball.

Finished

Finished coats, Farrell and Ball.

Finished

Finished coats, Farrell and Ball.

Finished

Finished coats, Farrell and Ball.

Finished

Finished coats, Farrell and Ball.

Hall Stairs Landing

Preparation

Boarder to be taken off before painting.

Preparation

Boarder removed and room started painting.

Preparation

Started painting 1st coat.

Preparation

Spindles to be painted with Zinsser.

Preparation

Spindles to be painted with Zinsser.

Preparation

Spindles to be painted white.

Preparation

Down stairs study finished.

Preparation

Study finished.

Preparation

Down stairs study finished.

Preparation

Hallway 1st coat.

Preparation

Hallway 1st coat.

Finished

Hall, stairs and landing finished.

Preparation

Hall, stairs and landing finished.

Preparation

Hallway finished.

Preparation

Hallway finished.

Preparation

Hallway finished.

Preparation

Door finished with Sadolins extra.

Preparation

Toilet finished.

Preparation

Toliet finished.

Manor House

Before Pictures

Gable end scaffolded out.

Before Pictures

Gable end.

Before Pictures

Faded doors.

Before Pictures

Facscia breaking down.

Before Pictures

Windows breaking down.

Before Pictures

Window breaking down.

Finished

Fascias finished with Sadolins.

Finished

Windows finished with Sadolins.

Finished

Doors finished with Sadolins.

Finished

Gable end of the house finished with Sadolins.

Finished

House finished with Sadolins.

Finished

Conservatory finished with Sadolins.